University of South Florida Solenoid Axis Presentation & Excel Sheet Instructions-6 Background: The solenoid is a coil system which is long typically gre

University of South Florida Solenoid Axis Presentation & Excel Sheet Instructions-6

Background:

Don't use plagiarized sources. Get Your Custom Essay on
University of South Florida Solenoid Axis Presentation & Excel Sheet Instructions-6 Background: The solenoid is a coil system which is long typically gre
For $10/Page 0nly
Order Essay

The solenoid is a coil system which is long typically greater than the diameter of its cross section. It consists of tightly would conducting wires with an N number of turns. It generates a magnetic field through its volume. But, along its axis, depending on which way the current is flowing through the wires, the field has a particular value and points axially. The field generated by a solenoid along the axis is

B=μ0NLI

In the above equation, μ0 is the constant of permeability of free space, I is the current through the windings, and NL is the number of turns per unit length. For this lab, NL=1000.

Lab instructions: [Review your textbook for information about the solenoid. Study every aspect presented.]

Part I

1. Review the video to collect your data. NOTE: If you read the current off of the power-supply (BK-Precision on the lower reading), you have more sig figs. Notice any fluctuations and wait until the Tesla meter settles!. Column A in Excel is current (in Amps). Column B is magnetic field (mT). Column C is (column B)/1000 to convert to Tesla (T). Column D is (column C)/1,000. You are dividing your turns per length in this last step. Make sure Column A is in Amps!!

2. Plot Column D vs. Column A. Clearly label the graph for presentation with the correct units. Is it linear? What SHOULD be the slope?

3. Run a LINEST with the dependent being column D and independent being column A. Record the slope and its uncertainty. Does it seem reasonable? What are the units?

4. Now, do a t-value analysis. Using the equation, t=|actual−experimental|uncertainty, determine if the t-value is greater than 1, less than 1, or equal to 1. In either scenario, explain what it means. In your explanation, look at all of the facts in front of you. Any take-home lessons to share?

5. Save and upload the file.

*****i have the video but its too large to upload if you have idea how to share pleas tell me*****

Part II

1. Open up the power-point file.

2. On the first slide, draw the magnetic field lines coming out of the cross-section. Note the direction of the current. You must draw these in the right direction and place arrows on your field lines for credit.

3. On the next slide, use the “wires” to connect up the experiment. Place the meter where it belongs to do a proper measurement. Take the values given at the top. After you have positioned everything and is connected up (note that you click on and grab a wire and change its length to connect everything), use Insert/textbox to place the value of the magnetic field (in mT) in the blanks on the meter.

Important: You can move the meters and items around any way you like!

4. Save and upload the file. Draw as many field lines associated with this solenoid. Use arrows.
Solenoid axis
V = 2.3 V, R = 3.7 , N = 150, L=15 cm
wires
ammeter
mT

Purchase answer to see full
attachment

admin

Recent Posts

Economic Debate #3- Progressive Income Tax – The Homework Helper

Economic Debate- Progressive Income Tax For this Economic Debate, we are going to discuss the…

2 years ago

MKT 6120 – Marketing Management – Davis Learning Engagement #7

TOPIC: Going Global Discussion Thread 1 (initial post due Wednesday for full credit) Please note:…

4 years ago

jvjvjhvjhvhjvj

Assignment Topic This week will culminate in the creation of a narrated PowerPoint to create…

4 years ago

Students are supposed to select a technological organization of their choice.

The Assignment must be submitted on Blackboard (WORD format only) via allocated folder. Assignments submitted…

4 years ago

Increases the risk of wildfires

you need to post your 2-page information flier to share with your Final Project Group.…

4 years ago

Statistics for Technology management

discussion: Discuss the methods used at your company to measure and ensure quality products and…

4 years ago