Answer the following questions (35 points):
Question 1. (6 pts) List and describe the 2 mainly utilized locating methods.
Question 2. (6 pts) What are the three types of workpiece location?
Question 3. (3 pts) Design a locating system to locate and support the part shown in Figure A.
Ø 3.50
1.00
+
Ø 1.25
Question 4. The workholder below was designed for slot milling the top surface of the part in
the location indicated by the darker shaded section.
(a) Which arrow indicates the direction of proper cutter movement (circle A or B below)?
(3 points)
A
or
B
(b) On the drawing, indicate with X’s, where you would position clamps to hold the part.
(6 points)
MFGE 336 Production Engineering
Homework 6
A
&
indicate locators
(dashed below part).
X
indicates clamping
location.
B
Question 5. Answer the following questions (2 points each):
a) Describe how radial locators are used.
b) Discuss why chips and dirt must be controlled in a machining environment.
c) Discuss several ways that work holders can be designed to facilitate control of chips and dirt.
Question 6. True or False? Select “T” for true statements and “F” for false statements. (1 point
each)
____1. Workholders constrain three rotational and six translational degrees of freedom.
____2. Clamps must be positioned to contact the workpiece at its most rigid point.
____3. Locating points should be chosen to be as close as possible to each other on a workpiece
surface.
____4. Redundant location is required when locating a particular surface or plane of a
workpiece.
____5. Indirect clamps are more prone to loosen up and hence they are not used in processes
where cutting forces are intermittent.

Don't use plagiarized sources. Get Your Custom Essay on
University of Oregon Manufacturing and Production Engineering Questions please answer these question and try to include all the details. thank you f
For $10/Page 0nly
Order Essay

Purchase answer to see full
attachment

admin

Recent Posts

Economic Debate #3- Progressive Income Tax – The Homework Helper

Economic Debate- Progressive Income Tax For this Economic Debate, we are going to discuss the…

2 years ago

MKT 6120 – Marketing Management – Davis Learning Engagement #7

TOPIC: Going Global Discussion Thread 1 (initial post due Wednesday for full credit) Please note:…

4 years ago

jvjvjhvjhvhjvj

Assignment Topic This week will culminate in the creation of a narrated PowerPoint to create…

4 years ago

Students are supposed to select a technological organization of their choice.

The Assignment must be submitted on Blackboard (WORD format only) via allocated folder. Assignments submitted…

4 years ago

Increases the risk of wildfires

you need to post your 2-page information flier to share with your Final Project Group.…

4 years ago

Statistics for Technology management

discussion: Discuss the methods used at your company to measure and ensure quality products and…

4 years ago