Luxury Furniture designs and builds factory-made, premium, wood armoires for homes. All are of white oak. Its budgeted manufacturing overhead costs for the year 2012 are as follows.
| Overhead Cost Pools Don't use plagiarized sources. Get Your Custom Essay on luxury furniture designs and builds factory made premium wood armoires for homes 538977 For $10/Page 0nly | Amount |
| Purchasing | $ 45,000 |
| Handling materials | 50,000 |
| Production (cutting, milling, finishing) | 130,000 |
| Setting up machines | 85,000 |
| Inspecting | 60,000 |
| Inventory control (raw materials and finished goods) | 80,000 |
| Utilities | 100,000 |
| Total budget overhead costs | $550,000 |
For the last 4 years, Luxury Furniture has been charging overhead to products on the basis of materials cost. For the year 2012, materials cost of $500,000 were budgeted. Jim Brigham, owner-manager of Luxury Furniture, recently directed his accountant, Bob Borke, to implement the activity-based costing system that he has repeatedly proposed. At Jim Brigham’s request, Bob and the production foreman identify the following cost drivers and their usage for the previously budgeted overhead cost pools.
| Expected | ||
| Use of | ||
| Overhead Cost Pools | Activity Cost Drivers | Cost Drivers |
| Purchasing | Number of orders | 500 |
| Handling materials | Number of moves | 5,000 |
| Production (cutting, milling, finishing) | Direct labor hours | 65,000 |
| Setting up machines | Number of setups | 1,000 |
| Inspecting | Number of inspections | 4,000 |
| Inventory control (raw materials and finished goods) | Number of components | 40,000 |
| Utilities | Square feet occupied | 50,000 |
Debbie Steiner, sales manager, has received an order for 12 luxury armoires from Thom’s Interior Design. At Debbie’s request, Bob prepares cost estimates for producing 12 armoires so Debbie can submit a contract price per armoire to Thom’s. He accumulates the following data for the production of 12 armoires.
| Direct materials | $5,200 |
| Direct labor | $3,500 |
| Direct labor hours | 200 |
| Number of purchase orders | 3 |
| Number of material moves | 32 |
| Number of machine setups | 4 |
| Number of inspections | 20 |
| Number of components | 640 |
| Number of square feet occupied | 320 |
Instructions
(a) Compute the predetermined overhead rate using traditional costing with materials cost as the basis.
(b) What is the manufacturing cost per armoire under traditional costing?
(c) What is the manufacturing cost per armoire under the proposed activity-based costing? (Prepare all of the necessary schedules.)
(d) Which of the two costing systems is preferable in pricing decisions and why?
Economic Debate- Progressive Income Tax For this Economic Debate, we are going to discuss the…
TOPIC: Going Global Discussion Thread 1 (initial post due Wednesday for full credit) Please note:…
Assignment Topic This week will culminate in the creation of a narrated PowerPoint to create…
The Assignment must be submitted on Blackboard (WORD format only) via allocated folder. Assignments submitted…
you need to post your 2-page information flier to share with your Final Project Group.…
discussion: Discuss the methods used at your company to measure and ensure quality products and…