CE310 Northwest Wastewater Treatment Plant Tour Assignment I visited Northwest Wastewater Treatment Plant in Carbondale, IL ( 1699 New Era Rd, Carbondale, IL 62901 ). The assignment is to write Two pages summary. The points that you should talk about are located in the word file attached. Also, some requirements you need to follow.
I will attach some clips and website link to help you finish the assignment.
https://explorecarbondale.com/176/Northwest-Wastewater-Treatment-Plant
https://www.youtube.com/watch?v=FvPakzqM3h8 CE 310 Wastewater Treatment Plant Tour Make-up Assignment
Name:
Date:
Please cover the following in a two-page, single spaced report with a space after each paragraph
(12 pt font, Times-New Roman, 1-inch margins all around, separate reference page- you can use
this word file as your go-by).
Please explain in a 2-page report the wastewater treatment process, not water treatment.
The following are some good points to review.
Include a general overview of the wastewater treatment process what does it
take to make influent into effluent.
What are some common discharge limits for WWTP effluent
Common tests performed
Water Reclamation Facility vs. Wastewater Treatment Plant
Review the chemicals used in the treatment process and what purposes they serve
So on and so forth
.
Remember, this is a report and should be structured as such. (Introduction, body and conclusion)
Due next lab class
1
Purchase answer to see full
attachment
Economic Debate- Progressive Income Tax For this Economic Debate, we are going to discuss the…
TOPIC: Going Global Discussion Thread 1 (initial post due Wednesday for full credit) Please note:…
Assignment Topic This week will culminate in the creation of a narrated PowerPoint to create…
The Assignment must be submitted on Blackboard (WORD format only) via allocated folder. Assignments submitted…
you need to post your 2-page information flier to share with your Final Project Group.…
discussion: Discuss the methods used at your company to measure and ensure quality products and…