?Advanced Power System Networks Planning and Analysis Aim:
Model, analyse and simulate of power system components based on planning study of power system networks.
Summary of the task:
An electric power system is a network of electrical components positioned to supply, transfer [transmission and Distribution], and use electric power. Power flow study that provides power to an extended area. An electrical grid power system can be broadly divided into the generators that supply the power, the transmission system that carries the power from the generating centers to the load centers, and the distribution system that feeds the power to nearby homes and industries. The power is generated at 11kV or 333kVand is stepped up to high voltages of 220kV and 132 kV for transmission. The transmission voltages are to a large extent determined by system loss considerations. High voltage transmission requires conductors of larger cross-section which results in lower resistances, hence less energy losses on transmission lines. The load centers are usually located away from generating stations. Therefore, the power is transmitted to the load centers where it is stepped down to 66kV or 33kV, the distribution level. The load demand determines the voltage at which power is to be supplied. The loads may be residential-industrial -commercial which brings about the peak load and off-peak load hours. Power is transmitted from low demand areas to high load demand in the grid network.
The control of generation, transmission, distribution and area exchange is performed from a centralized location. In order to perform the control functions satisfactorily, the steady state power/load flow must be known. The entire system is modelled as an electric network and a solution is simulated using a digital program. Such a problem solution practice is called power or load flow study. The analysis of Power Systems under fault condition represents one of the most important and complex tasks in Power Engineering. The studies and detection of these faults is necessary to ensure that the reliability and stability of the power system do not suffer a decrement as a result of a critical event such a fault. This course work will conduct analyze the behavior of a system under fault conditions and evaluate different scenarios of faults.
The power flow analysis load flow and faulty study are important and tools involving numerical analysis applied to a power system. The results play a major role in the day to day operation of any system for its control and economic schedule.
TASKS
Explain the significance of the load forecasting, load driving parameters
Load flow solution for the distribution 6 nodes and IEEE 30 node transmission network using any standard method and compare its performance
Explain how symmetrical and unsymmetrical fault analysis place vital role in the design power system components.
Implement the concept of uncertainty in the load and line data of the power system network.
Recommendation of results to benefits the distribution and transmission company
Structure for the Report:
Abstract
Introduction
Data Selection, Design and Implementations steps
Result Analysis
Conclusion and Recommendations
*** Words count = 2500 words.
*** In-Text Citations and References using Harvard (CCE Style).
*** Ive uploaded attachment named load forecasting help related for first point. www.ijraset.com
IC Value: 45.98
Volume 5 Issue IV, April 2017
ISSN: 2321-9653
International Journal for Research in Applied Science & Engineering
Technology (IJRASET)
An Overview of Different Types of Load
Forecasting Methods and the Factors Affecting the
Load Forecasting
Vikas Gupta1, Seema Pal2
1
PG Student , Assistant Professor2, Department of Electrical Engineering
Jabalpur Engineering College, Jabalpur (M.P.), India
Abstract: load forecasting is vitally important for the electric industry in the deregulated economy. Load forecasting is about
estimating future consumptions based on various data and information available and as per consumer behavior. Load
forecasting mean forecasting average load in kw or total load in kwh for blocks of hourly, daily, weekly, monthly or yearly.
There are different tools and techniques for load forecasting. One of the primary tasks of an electric utility is to accurately
predict load demand requirements at all times, especially for short term. It has many applications including energy purchasing
and generation, load switching, contract evaluation, and infrastructure development. Hence knowing the load behavior in
advance is very important in planning, analysis and operation of power systems to maintain an uninterrupted, reliable, secure
and economic energy providing.
Keywords: electric load forecasting, short time load forecasting (stlf), long term load forecasting (ltlf) , medium term load
forecasting (mtlf)
I.
INTRODUCTION
Load forecasting is extremely important in electric energy generation, transmission, distribution and markets. Load forecast has
been a central and an integral process in the planning and operation of electric utilities. The Purpose of load forecasting is proper
planning and operation of a power utility requires an adequate model for electric power load forecasting [1]. Load forecasting plays
a key role in helping an electric utility to make important decisions on power market, load switching, voltage control, network
reconfiguration, and infrastructure development. Here we have discussed three type of load forecasting which are:Long-term electric load forecasting used to supply electric utility company management with prediction of future needs for
expansion, equipment purchases or staff hiring. This is longer than a year.
Medium-term forecasting, used for the purpose of scheduling fuel supplies and unit maintenance. This is usually from a week to a
year. Short-term forecasting, it is used to supply necessary information for the system management of day-to-day operations and
unit commitment [1][5].
II.
LOAD FORECASTING MODEL DEVELOPMENT
729
©IJRASET: All Rights are Reserved
www.ijraset.com
IC Value: 45.98
Volume 5 Issue IV, April 2017
ISSN: 2321-9653
International Journal for Research in Applied Science & Engineering
Technology (IJRASET)
A. Short Term Load Forecasting
Short-Term Load Forecasting is basically a load predicting system with a leading time of one hour to seven days, which is necessary
for adequate scheduling and operation of power systems. It has been an essential component of Energy Management Systems
(EMS). For proper and profitable management in electrical utilities, short-term load forecasting has lot of importance. Short term
load forecasting methods are:
1) Similar Day Look up Approach: Similar day approach is based on searching historical data of days of one, two or three years
having the similar characteristics to the day of forecast. The characteristics include similar weather conditions, similar day
of the week or date [7].
2) Regression based Approach: Linear regression is a technique which examines the dependent variable to specified
independent. The independent variables are firstly considered because changes occur in them unfortunately. In energy
forecasting, the dependent variable is usually demand of the electricity because it depends on production which on the other
hand depends on the independent variables [8] [9] .
3) Time Series Analysis: Time series forecasting is based on the idea that reliable predictions can be achieved by
modeling patterns in a time series plot, and then extrapolating those patterns to the future. Using historical data as input,
time series analysis fits a model according to seasonality and trend. Time series models can be accurate in some situations,
but are especially complex and require large amounts of historical data [12].
4) Artificial Neural Networks: ANN is a soft technique used in various optimization processes. This method is able to perform
non-linear modelling and adaptation. It does not require assumption of any functional relationship between load and weather
variables in advance. We can adapt the ANN by exposing it to new data. The ANN is also currently being investigated as a tool
in other power system problems such as security assessment, harmonic load identification, alarm processing, fault diagnosis,
and topological observability [13].
5) Expert Systems: An expert system is a computer program, which has the ability to act as an expert. This means this computer
program can reason, explain, and have its knowledge base expanded as new information becomes available to it. The
load forecast model is built using the knowledge about the load forecast domain from an expert in the field [14][15].
6) Fuzzy Logic: Fuzzy logic based on the usual Boolean logic which is used for digital circuit design. In Boolean logic, the input
may be the truth value in the form of 0 and 1. In case of fuzzy logic, the input is related to the comparison based on
qualities.
7) Support Vector Machines: Support Vector Machines (SVM) is the most powerful and very recent techniques for the
solution of classification and regression problems. In support vector machines, linear functions are used to create linear
decision boundaries in the new space. In the case of neural network, the problem is in the choosing of architecture and in the
case of support vector machine, problems occurs in choosing a suitable kernel [16][17].
B. Medium and Long-Term Load Forecasting
The end-use modeling, econometric modeling, and their combinations are the most often used methods for medium- and long-term
load forecasting. Descriptions of appliances used by customers, the sizes of the houses, the age of equipment, technology changes,
customer behavior, and population dynamics are usually included in the statistical and simulation models based on the so-called
end-use approach. In addition, economic factors such as per capita incomes, employment levels, and electricity prices are included
in econometric models. These models are often used in combination with the end-use approach. Long-term forecasts include the
forecasts on the population changes, economic development, industrial construction, and technology development. Medium and
long-term load forecasting methods are:
1) Trend Analysis: Trend analysis (trending) extends past growth rates of electricity demand into the future, using techniques that
range from hand-drawn straight lines to complex computer-produced curves. These extensions constitute the forecast. Trend
analysis focuses on past changes or movements in electricity demand and uses them to predict future changes in electricity
demand. Usually, there is not much explanation of why demand acts as it does, in the past or in the future. Trending is
frequently modified by informed judgment, wherein utility forecasters modify their forecasts based on their knowledge of
future developments which might make future electricity demand behave differently than it has in the past [15].
2) End Use Analysis: The basic idea of end-use analysis is that the demand for electricity depends on what it is used for (the enduse). For instance, by studying historical data to find out how much electricity is used for individual electrical appliances in
homes, then multiplying that number by the projected number of appliances in each home and multiplying again by the
730
©IJRASET: All Rights are Reserved
www.ijraset.com
IC Value: 45.98
Volume 5 Issue IV, April 2017
ISSN: 2321-9653
International Journal for Research in Applied Science & Engineering
Technology (IJRASET)
projected number of homes, an estimate of how much electricity will be needed to run all household appliances in a
geographical area during any particular year in the future can be determined. Using similar techniques for electricity used in
business and industry, and then adding up the totals for residential, commercial, and industrial sectors, a total forecast of
electricity demand can be derived. The advantages of end-use analysis is that it identifies exactly where electricity goes, how
much is used for each purpose, and the potential for additional conservation for each end-use [18].
3) Econometric Analysis: Econometrics uses economics, mathematics, and statistics to forecast electricity demand. Econometrics
is a combination of trend analysis and end-use analysis, but it does not make the trend-analysts assumption that future
electricity demand can be projected based on past demand. Moreover, unlike many end-use models, econometrics can allow for
variations in the relationship between electricity input and end-use. Econometric models work best when forecasting at national,
regional, or state levels. For smaller geographical areas, meeting the model can be a problem [15].
4) Neural Network Technique: It is similar as to the neural network technique used for the short term load forecasting except in
this technique with train the network with the large data and forecast the load for the whole or for long term [13].
5) Multiple Linear Regressions: Regression is the one of most widely used statistical techniques. Since, the load is totally
dependent on the temperature, humidity, wind speed and day type parameters hence regression is used to obtain the relationship
between load and these parameters [10][11].Firstly, using the past data the values of regression parameters a, b, c is calculated
and using these parameters and the load is forecasted for long term.
C. Factors Affecting Short Term Load Forecasting
1) Time Factor: Time is the most important factor in short term load forecasting because its impact on consumer load is highest.
From observing load curve of several different grid stations it is found that the load curve has time of the day property, also it
has day of week, week of month and month of season property[19].
2) Economic Factor: Since electricity nowadays became peoples daily life necessity so it has turned to be a commodity. Thus
economy of the state has also an impact on the usage of electricity. Economic factor has more importance in long term
forecasting, but it also can impact the load curve for short term load forecasting. Economic factors such as price of electricity,
management of load and degree of industrialization have a significant impact on system average load and system maximum
demand [19].
3) Weather Factor: Weather is the most important independent variable for load forecasting. The effect of weather is most
prominent for domestic and agricultural consumers, but it can also alter the load profile of industrial consumers. Load
forecasting models use weather forecast and other factors to predict the future load, thus to minimize the operational cost..
Unpredicted sea breeze, after moon thunderstorms, back door fronts is some of the environmental factors that can decrease the
temperature and thus causing overestimated load forecast. Thus we are producing more power than required[19].The weather
factor includes:
Temperature: Temperature can also alter the conductivity of the transmission lines. Thus temperature can affect the overall
carrying capability of the transmission lines. High temperature can increase not only the resistance of the transmission lines, but
also it can alter the reactance of line, due to temperature induced expansion of the length of transmission line[19].
4) Humidity: Humidity is a term used for the amount of water vapors in air. Humidity has no effect on real temperature but it can
intensify the severity of hot climate. So it is concluded from the above observation that for the prediction of daily load of
domestic consumers we must consider apparent temperature instead of real temperature. But if we are dealing with an area
having all types of consumers from industrial to agricultural and domestic temperature humidity index can be employed as
the affecting factor for load forecasting [19].
It is the measure of the motion of air with respect to the surface of the earth covering a unit distance in unit time.
a) Effect of Wind Speed on Load Consumption: At low humidity rates the speed of wind lowers the apparent temperature and
increases the rate of evaporation of perspiration from the human body therefore it gives the cooling effect. Thus during a windy
day of summer the consumption of electricity will be lower because lesser cooling appliances will be used
b) Wind Chill Index: Wind chill factor is the felt air temperature on exposed skin due to wind. Wind chill temperature is always
less than the air temperature and is undefined at temperature above 10 degree Celsius. Therefore in winter season load
consumption on a windy day will be high ,thus wind speed can also affect the load consumption [19].
5) Random or Occasional Spikes: The power system consists of different types of consumers for example domestic, agricultural,
industrial etc. The overall load of domestic consumers shows good statistical rules and is periodic in nature, but on the other
731
©IJRASET: All Rights are Reserved
www.ijraset.com
IC Value: 45.98
Volume 5 Issue IV, April 2017
ISSN: 2321-9653
International Journal for Research in Applied Science & Engineering
Technology (IJRASET)
hand industrial and agricultural loads are highly inductive and start up and shut down of such type of load induce huge spikes to
the load curve. These spikes are called the random disturbance because start up and shut down of these huge loads is quite
random in nature and there is no way to predict the occurrence of these spikes. CNG station load also lies in this category. If we
add these spikes in the training data of ANN model then the average error of the model becomes very high. Special events such
as religious or cultural celebrations also are another source of random disturbance. Diwali, Eid day, Christmas and other
religious events [19].
D. Factors Affecting Medium and Long Term Forecasting
The end-use modeling, econometric modeling, and their combinations are the most often used methods for medium and long term
load forecasting. Some of the most influencing factors that affects the Medium and Long term load forecasting can enlisted as
below:
1) Descriptions of appliances used by customers.
2) The sizes of the houses.
3) The age of equipment.
4) Technology changes.
5) Customer behavior.
6) Population dynamics are usually included in the statistical and simulation models based on the so-called end-use approach.
7) Economic factors such as per capita incomes.
8) Employment levels, and
9) Electricity prices are included in econometric models.
III.
LOAD FORECASTING IS CRITICAL IN INDIAN SCENARIO
India being a developing country load forecasting is one of the most concerned tasks in the power market. Apart from the
conventional factor that affects the load forecasting, there are some more factor that play an important role in the load forecasting in
India. Some of those can be enlisted as Energy Deficit Market, Significant Growth, Continuous shift of growth pattern as GDP of
India in 2014 was 7.2% , and in 2015 it increased to 7.6% [3], Technical and Commercial Losses as there was a recession in 2008 in
India due to slow down in US economy[4], Distribution Infrastructure, Metering Infrastructure, Nascent Market Mechanism
Regulatory Policies, Renewable / Distributed Generation [2][4][5].
Figure 5: Sources of Power for Distribution Company [5]
IV.
CONCLUSION
In this paper a discussion on several statistical and artificial intelligence techniques, Indian Scenario for load forecasting that have
been developed for short, medium and long term electric load forecasting. Also a discussion on the factors that affect the
accuracy of the forecasts such as weather data, time factors, customer classes, as well as economic and end use factors is done.
Instead of using the single weather forecast, weather ensemble predictions can be used as multiple inputs for load forecasts. These
inputs generate multiple load forecasts. A comparative analysis of the practical load forecasted result can be done among some
methods .After that the best method may be recommended to several power utilities.
732
©IJRASET: All Rights are Reserved
www.ijraset.com
IC Value: 45.98
Volume 5 Issue IV, April 2017
ISSN: 2321-9653
International Journal for Research in Applied Science & Engineering
Technology (IJRASET)
REFERENCES
[1]
[2]
[3]
[4]
[5]
[6]
[7]
[8]
[9]
[10]
[11]
[12]
[13]
[14]
[15]
[16]
[17]
[18]
[19]
M.Babita Jain, Manoj kumar Nigam, Prem Chand Tiwary Curve Fitting And Regression Line Method Based Seasonal Short Term Load Forecasting 2012
World Conference on Information Technology, 2012
http://www.worldbank.org/en/country/india
Roger E.A. Farmer NBER Working Paper No. 17479 Issued in October 2011,NBER Program(s): EF
Indian PowerScenario-A road map to 2020 by Prutha Khanzode, Siddhartha Nigam,2014 ,ICCPCT,School of Electrical Engineering, VIT University Vellore,
TamilNadu, India.
“Power Procurement Strategy and Power Exchanges” by ATUL AGRAWAL Indian Institute of Technology Kanpur (IITK) and Indian Energy Exchange
Journal of Clean Energy Technologies, Vol. 2, No. 4, October 201
Qingqing Mu , Yonggang Wu , Xiaoqiang Pan, Liangyi Huang, Xian Li Short-term Load Forecasting Using Improved Similar Days Method 978-1-42444813-5/10/$25.00 ©2010 IEE
Jing-Min Wang and Li-Ping Wang, A new method for short-term electricity load forecasting,Transactions of the Institute of Measurement and
Control 30, 3/4 (2008) pp. 331-34
S. Ruzic, A.Vuckovic, and N. Nikolic, Weather Sensitive Method for Short-Term Load Forecasting in Electric Power Utility of Serbia, IEEE
Transaction on Power Systems, 18:1581 1586, 200
T. Haida and S. Muto, Regression Based Peak Load Forecasting using TransformationTechnique.IEEE Transactions on Power Systems, 9:17881794,
1994.
W. Charytoniuk, M.S. Chen, and P. Van Olinda. Nonparametric Regression Based ShortTerm Load Forecasting, IEEE Transactions on Power
Systems, 13:725730,1998.
Short term load forecasting using time series modeling with peak load estimation capability, IEEE Transactions on Power Systems, Vol.16, No.3
August 2001
D.C. Park, M.A. El-Sharkawi, R.J. Marks II, L.E. Atlas & M.J. Damborg,”Electric load forecasting using an artificial neural network”, IEEE
Transactions on Power Engineeringvol.6,pp.442-449(1991)
H. Mori and S. Tsuzuki, “Power System Topological Observability Analysis Using a Neural NetworkModel,” Proc. of 2nd Sym. on Expert Systems
Application to Power Systems,pp.385-391,July,1989
M. S. Kandil, S. M. El-Debeiky, Senior Member, IEEE, and N. E. Hasanien , Long-Term Load Forecasting for Fast Developing Utility Using a
Knowledge-Based Expert System.
Mohamed Mohandes, Support vector machines for short-term electrical load forecasting INTERNATIONAL JOURNAL OF ENERGY RESEARCH Int. J.
Energy Res. 2002;26:335}345(DOI:10.1002/er.787)
Wei Chu, S. Sathiya Keerthi, Chong Jin Ong, A GENERAL FORMULATION FOR SUPPORT VECTOR MACHINES, Proceedings of the 9th
International Conference on Neural Information Processing(ICONIP’OZ)Vol.5
Samsher Kadir Sheikh1, M. G. Unde, Short-Term LoadForecasting Using Ann TechniqueVolume1,Issue2pp:97-10©IJESE
Chapter 12 LOAD FORECASTING Eugene A. Feinberg State University of New York, Stony BrookEugene.Feinberg@sunysb.edu Dora GenethliouState
University of N…
Purchase answer to see full
attachment
Economic Debate- Progressive Income Tax For this Economic Debate, we are going to discuss the…
TOPIC: Going Global Discussion Thread 1 (initial post due Wednesday for full credit) Please note:…
Assignment Topic This week will culminate in the creation of a narrated PowerPoint to create…
The Assignment must be submitted on Blackboard (WORD format only) via allocated folder. Assignments submitted…
you need to post your 2-page information flier to share with your Final Project Group.…
discussion: Discuss the methods used at your company to measure and ensure quality products and…