1. To separate the semi-variable costs into their fixed and variable components, one can use which of the following methods?
a) labor variance method
b) material variance method
c) relevant range of activity method
d) high-low point method
2. A budget prepared using several differing levels of activity is a:
a) fixed budget
b) flexible budget
c) manufacturing cost budget
d) budget performance report
3. Direct factory labor is usually considered to be a ___________cost.
a) variable
b) fixed
c) semi-variable
d) mixed
4. The cost of utilities consumed in the factory is a good example of a_______cost.
a) variable
b) fixed
c) semi-variable
d) standard
5. The salary of the factory supervisor is a good example of a __________cost.
a)variable
b)fixed
c)semi-variable
d)standard
6. As the level of activity increases, the fixed cost per unit of activity:
a) increases
b) decreases
c) does not change
d) may increase or decrease
7. As the level of activity increases, the variable cost per unit of activity:
a) increases
b) decreases
c) does not change
d) may increase or decrease
8. As the level of activity increases, the total variable costs for the period:
a)increase
b)decrease
c)do not change
d)may increase or decrease
9. As the level of activity increases, the total fixed costs for the period:
a) increases
b) decrease
c) may increase or decrease
d) do not change
10. Costs that reflect what costs should be for the units of product manufactured during the period under normal efficient operating conditions are known as ___________costs.
a)variable
b)fixed
c)standard
d)semi-variable
11. In a factory, the fixed costs per unit are $45 when 400 units are produced. If 450 units are produced, the fixed costs per unit would be:
a)$45
b)$40
c)$10
d)$50.63
12. In a factory,the total variable costs are $600 if 500 units are produced. If 400 units are produced, the total variable costs would be:
a)$480
b)$600
c)$120
d)$333
13. The standard quantity of materials for a product was 40 pounds per unit at the standard price of $2.00 per pound. The actual price per pound of materials was $1.50, and the actual quantity used was 44 pounds. An analysis would indicate a:
a)$20.00 favorable price variance
b)$22.00 favorable price variance
c)$6.00 unfavorable quantity variance
d)$18.00 favorable price variance
14. The labor standard for a product was five hours at a wage rate of $8 per hour.The firm produced 900 units of the item.Labor Costs totaled $35,250 and 4,700 hours of labor were used. An analysis of labor costs would indicate:
a)a $750 favorable labor rate variance
b)a $1,600 unfavorable labor time variance
c)both the labor rate variance and the labor time variance listed above
d)a $1,600 favorable labor rate variance
15. The quantity variance for an item is the difference between its actual quantity and its standard quantity multiplied be the:
a)standard cost of the item
b)actual cost of the item
c)price variance
d)budgeted amount for the item
16. An unfavorable price variance for materials means that:
a)the actual cost of the materials was more than the budgeted amount
b)more materials were used in production than anticipated
c)more labor hours were required to work with the materials than expected
d)the actual cost of the materials was more than the standard cost
17. The materials price variance for an item is the difference between its actual price and its standard cost:
a)multiplied by the actual quantity used
b)multiplied by the standard quantity allowed
c)multiplied by the difference between the actual quantity and the standard quantity
d)divided by the actual quantity
18. The flexible budget usually shows:
a)only fixed costs
b)only variable costs
c)fixed and variable costs together
d)fixed and variable costs separately
Use the following information to answer questions 19 and 20.
The standard costs for a unit of product are shown below.
Materials 2 pounds at $1.00 per pound $2.00
Labor 1 hour at $10.00 per hour 10.00
Overhead 60% of direct labor 6.00
During June, Job N-5 for 100 units was completed. The actual costs of the job are shown below.
Materials 300 pounds at $1.45 per pound $435
Labor 200 hours at $9.50 per hour 1,900
Overhead Applied 60% of direct labor 1,140
19. Which of the following represents the material price variance?
a)$325 unfavorable
b)$235 unfavorable
c)$100 unfavorable
d)$135 unfavorable
20. Which of the following represents the material quantity variance?
a)$325 unfavorable
b)$235 unfavorable
c)$100 unfavorable
d)$135
We've got everything to become your favourite writing service
Money back guarantee
Your money is safe. Even if we fail to satisfy your expectations, you can always request a refund and get your money back.
Confidentiality
We don’t share your private information with anyone. What happens on our website stays on our website.
Our service is legit
We provide you with a sample paper on the topic you need, and this kind of academic assistance is perfectly legitimate.
Get a plagiarism-free paper
We check every paper with our plagiarism-detection software, so you get a unique paper written for your particular purposes.
We can help with urgent tasks
Need a paper tomorrow? We can write it even while you’re sleeping. Place an order now and get your paper in 8 hours.
Pay a fair price
Our prices depend on urgency. If you want a cheap essay, place your order in advance. Our prices start from $11 per page.